09-28-2020, 11:33 AM
(This post was last modified: 09-28-2020, 11:43 AM by robdrimmie.
Edit Reason: found some timeframe info
)
The rainbow crosswalk that crosses Joesph at Gaukel is also a thermoplastic coating. It cost $12,000 and was installed in May of 2018. This isn't novel or untested technology.
https://kitchener.ctvnews.ca/rainbow-cro...-1.3950437
From a time-frame perspective, the rainbow crosswalk that Cambridge declined to do last year was expected to last 7 - 10 years. It seems reasonable to expect this artwork could last that long as well.
https://www.cbc.ca/news/canada/kitchener...-1.5238813
https://kitchener.ctvnews.ca/rainbow-cro...-1.3950437
From a time-frame perspective, the rainbow crosswalk that Cambridge declined to do last year was expected to last 7 - 10 years. It seems reasonable to expect this artwork could last that long as well.
https://www.cbc.ca/news/canada/kitchener...-1.5238813