06-17-2016, 10:18 AM
Apologies if this was reported before, but Accelerator Centre is set to take occupancy within the next month or so of the second floor of 44 Gaukel (former Everest College space) for maker space.
General Urban Kitchener Updates and Rumours
|
« Next Oldest | Next Newest »
|