(11-10-2018, 10:01 PM)timio Wrote: Next up is Hespeler to Townline (2019 - 2021), followed by Townline -> Highway 25 in Milton (to be tendered, so who knows what the split is going to look like)
The RFP has closed for the Credit River -> Highway 25, so likely to be awarded in the next 6-12 months. So no matter which way you look at it, we're likely in for another decade until the proposed 401 widening is complete through Mississauga.
Which should be just in time for traffic engineers to declare the section in KW too congested and in need of widening, so continues the cycle of perpetual widening.