(10-10-2018, 12:34 PM)robdrimmie Wrote:(10-10-2018, 12:20 PM)GtwoK Wrote: Wasn't there some amount of soil remediation that had to be done here first? What happened with that?
I think that happened before the piles were driven. When the existing building was taken down the lot was completely cleared and a bunch of fill removed. Then the lot was refilled, levelled and sat untouched for a week or thereabouts before the pile driving phase began. So I think all the clean up work on the site was done as part of that phase.
Ah, I was under the impression that remediation involved removing more than just a top coat, and would take at least a month. Oops!