In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 2 Vote(s) - 4.5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION Phase 2 - Cambridge's Light Rail Transit
(12-17-2019, 07:37 PM)jeffster Wrote:
(12-17-2019, 09:55 AM)tomh009 Wrote: All the cost figures I was able to find said about $1M for the capital costs (construction and running stock, I expect), and that does not appear to have changed significantly. Is the $3M including something like $2M for operations?

The $5.5M number that Mulroney threw out boggles the mind. Apples and watermelons?

My understanding that the cost ballooned to $3B for rolling stock, property acquisitions, construction, and everything up to service date. That additional $2B is operational costs for whatever number of years. That $2B is disingenuous -- it's like our costs also went up to whatever, but also included operating it for 30 years (was it just over $2B for KW?).  But that's how it went from $1B to $5B. As far as I know, neither the provincial or federal are on the hook for anything else regarding the ION.

In Hamilton, I believe that Metrolinx was going to run this system, paid solely by the province, with no money from the city, though apparently Hamilton was going to keep the fair money.

Now, personally, I never understood how this project was only going to cost $1B in the first place. KW was close to $800M -- and that was years ago that we started. Factor in inflation, our system is probably closer to $1.1B now, if we were to start. A good chunk of our LRT is along previous rail corridors, and also within a relocated hydro corridor. That saved a lot of money. When the first heard of Hamilton LRT, I though initial costs would be close to $2.5B, and was surprised that it was going to be so little.

My guess is that the previous Liberal government pushed this project and left out certain numbers, and perhaps the $1B cost was for only rolling stock and basic rail construction (not including utility relocating, ripping up roads, demolishing homes/businesses, not including purchases of homes/businesses, no environment assessments, etc).

Inflation doesn't work that fast.  Even with inflation from 2010 (which I don't think would have been the target year for construction costs) CPI calculator still has our project at less than 1B.

Is the Hamilton project not a similar scope to ours? Where 1B would be a reasonable estimate, and 3B seems off (and of course 5B is a complete fabrication).
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION Phase 2 - Cambridge's Light Rail Transit - by danbrotherston - 12-17-2019, 09:45 PM

Forum Jump:


Users browsing this thread: 12 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.