04-24-2023, 08:22 AM
Hey, do we remember "Value Engineering" in Phase 1? Like how it was perhaps corner cutting that made the system cheaper (in a bad way) than it should be? Anyway, clearly the plan for Phase 2 hasn't been value engineered. Though it only feels like it can save like 20% and not 80% anyway.