06-04-2022, 02:54 PM
(06-04-2022, 02:19 PM)sevenman Wrote:(06-03-2022, 03:12 PM)danbrotherston Wrote: You're optimistic. The highway is there to promote development in the greenbelt. It is the policy that his donors want.
My bet is, it'll get built before the next election, or at least be so far along as to be impossible to cancel. And I don't see us having AW2D GO or highway 7 by then.
Ford is an unmitigated disaster. IMO 413 is the most unrecoverable harm he's going to cause. Even our healthcare system can be rebuilt, the Holland Marsh cannot be unpaved.
Hwy 413 doesn't go anywhere near the Holland Marsh
I think mixing up the 413 and the Bradford Bypass. Both planned to proceed by Ford.