03-14-2017, 09:13 PM
(03-14-2017, 06:26 PM)rangersfan Wrote: A lot of the new larger hydro poles are going in on the edge or protruding significantly into the existing sidewalk. I hope that the sidewalk is being shifted.
I thought this project was to include a multi use trail? If so the section from River to Lackner does not have this yet.
Yes the sidewalks are being shifted. When I walked by, I saw stakes in the ground labeling back of sidewalk/front of sidewalk shifted over closer to property lines.