10-21-2018, 12:37 PM
(10-20-2018, 11:01 PM)tomh009 Wrote: They are just concepts as the actual plans will be done by whoever is selected to develop the central station complex.
That said, you are free to choose pessimism and I can choose optimism, on this and other topics.
I am neither optimistic nor pessimistic on this matter. I am just observing that this city doesn’t really do indoor links. In the specific case of the transit terminal, it is so obvious that the LRT station should be integrated into the train and bus terminal that no concept should have ever been published that didn’t show them as integrated; and the LRT station design should have been done at the same time as a sufficient amount of the train station design to make it clear exactly how the stations are to integrate. They built the bridge, in effect, for the LRT system; why hasn’t the design of the train station (platforms and platform access, not necessarily the larger development around it) been figured out enough to understand how the LRT connects to it?