An earlier version of that article said that RTG (their GrandLinq) says it can meet a November 30 deadline (basically an extra month), but that an independent review panel says the end of February is the earliest the system would be available.
To meet the November 30 deadline RTG would:
Not conducting 12 consecutive days of trial runs on the entire rail line.
Not opening the north-side entrance to the Rideau Station.
Running only 32 trains instead of all 34, because two still aren't equipped with computer modules needed to run properly
To meet the November 30 deadline RTG would:
Not conducting 12 consecutive days of trial runs on the entire rail line.
Not opening the north-side entrance to the Rideau Station.
Running only 32 trains instead of all 34, because two still aren't equipped with computer modules needed to run properly