12-28-2018, 09:46 AM
(12-28-2018, 08:26 AM)Canard Wrote: The Kitchener GO line goes right by the Eglinton Crosstown's MSF. It's really coming along! I only caught a quick glimpse (before I realized what I was looking at), but it looks like all the main buildings are up, yard track in, and caternay installed, too.
(As a side commentary, I would propose that only now is Metrolinx actually able and ready to take delivery of vehicles, for all their bellyaching about the delivery schedule.)
Good to hear! It would be interesting to know how things would have turned out if Bombardier had not had its problems. Would Metrolinx have gotten their act together, without the ability to hide behind somebody else’s delays? Or would we still be on the same schedule, just with Bombardier fully in the clear?