06-11-2021, 09:46 AM
(06-11-2021, 09:27 AM)robdrimmie Wrote:(06-11-2021, 09:11 AM)ZEBuilder Wrote: The entire parking lot is definitely ripped up so that would make sense but why would they need a mobile crane to redo the parking lot? The hole they had dug when I was by was rather deep and much deeper then required to redo the subbase for a parking lot which is why I was wondering if something else was going on.
I just asked her about it again, at least taking my mediocre memory out of the chain, and I had forgotten that they are adding two floors so they need to do a bunch of work on the foundation too.
The 3 floor apartment building next door (581 Strasburg) is the one that they're doing the 2 floor addition on. The building with the large hole and mobile crane is 593 Strasburg which is next door to the building that is getting the 2 floor addition, it appears at least based on the cities mapping application that the property may be getting severed into 2 lots with 595 Strasburg being created as thats a lot number which has just appeared in the last day which could explain something. Then next door to that is 599 Strasburg which is the empty lot that now has some activity and a building permit.