04-08-2016, 04:13 PM
(04-08-2016, 03:11 PM)tomh009 Wrote: Each one of those is about 50% primarily greenery, and 50% (25m) of primarily concrete. That's about 20 seconds (x2) of walking past concrete at a moderate walking speed of 5 km/h.
The problem isn't really the 2 sections of 25m of retaining wall, it's the fact that the entire 150m frontage on the sidewalk is inactive. Either a retaining wall, generic hedges, or a gaping void for a pathway that eventually leads to... somewhere.
All I want is for them to extend a concrete path above that garage entrance and bridge over the pedestrian canyon, so that you can walk parallel to King, but at the shops level.