07-10-2021, 12:01 PM
(This post was last modified: 07-10-2021, 12:02 PM by danbrotherston.)
Probably the gates won't get installed, given they have been removed from the rest of the trail. That being said, at this point, I wouldn't put anything past what our engineers would do.
That being said, design we discussed, which is already truly mediocre is not what is being built today. The proposed design shows a much gentler curve with a trail significantly widened. That is not at all what being constructed right now.
That being said, design we discussed, which is already truly mediocre is not what is being built today. The proposed design shows a much gentler curve with a trail significantly widened. That is not at all what being constructed right now.