I definitely remember seeing a drawing of this crossing years ago and being disappointed in it. Did we really not discuss it here?
Edit: I found some discussion here: https://www.waterlooregionconnected.com/...hp?tid=378&pid=56663#pid56663
But it looks like that was based on an RFT that was cancelled (https://regionofwaterloo.bidsandtenders....64a1d19f8d). There were also gates in those drawings, so I hope that doesn't happen too.
Edit: I found some discussion here: https://www.waterlooregionconnected.com/...hp?tid=378&pid=56663#pid56663
But it looks like that was based on an RFT that was cancelled (https://regionofwaterloo.bidsandtenders....64a1d19f8d). There were also gates in those drawings, so I hope that doesn't happen too.