10-06-2018, 12:56 PM
P2018-16 Supply of Three (3) Prefabricated Pedestrian Bridges for Homer Watson Boulevard Improvements
"The work of this contract includes the supply, delivery, manufacture, and installation of three (3) pedestrian bridges as part of a larger Homer Watson Boulevard Improvements and Multi-Use Trail project scheduled for 2019 construction in the Transportation Capital Program. The pedestrian bridges will be delivered and installed at two (2) Schneider Creek crossings, as well as a Balzer Creek crossing, within the project limits. It is anticipated that the bridges will be manufactured starting in February 2019 with delivery and installation to the sites beginning in March 2019 and ending in September 2019."
"The work of this contract includes the supply, delivery, manufacture, and installation of three (3) pedestrian bridges as part of a larger Homer Watson Boulevard Improvements and Multi-Use Trail project scheduled for 2019 construction in the Transportation Capital Program. The pedestrian bridges will be delivered and installed at two (2) Schneider Creek crossings, as well as a Balzer Creek crossing, within the project limits. It is anticipated that the bridges will be manufactured starting in February 2019 with delivery and installation to the sites beginning in March 2019 and ending in September 2019."
Everyone move to the back of the bus and we all get home faster.