The PCC materials are out for the active transportation bridge over highway 7.
The preferred alignment option is "Alternative 1B (bridge located at the end of Southmoor Drive with straight ramps and stairs at each end of the bridge)" and the preferred bridge type is "Bridge Type 1 Steel truss or Bridge Type 2 (Concrete U-Girder)."
The preferred alignment option is "Alternative 1B (bridge located at the end of Southmoor Drive with straight ramps and stairs at each end of the bridge)" and the preferred bridge type is "Bridge Type 1 Steel truss or Bridge Type 2 (Concrete U-Girder)."
Everyone move to the back of the bus and we all get home faster.