03-23-2022, 09:53 PM
(03-23-2022, 06:48 PM)dtkvictim Wrote:(03-23-2022, 04:23 PM)cherrypark Wrote: New information about the Stewart St and Joseph St MUTs reconstruction is on EngageWR now, including the drawings package.
Nothing particularly new, though I am glad to see that the MUT transition into the intersection at Victoria and through to the bike path is going to be properly graded down instead of the pedestrian curb cut and slopes like every wrist-breaking intersection on the Victoria St E MUT.
I didn't realize Stewart was getting a MUT as well, that's good. I hope it all connects well, especially the Victoria St crossing. It will be great to finally be able to bypass Victoria Park to get to the IHT from downtown.
I still don't understand the transition between Waverly and Cherry Park at all, but I can tolerate it...
Yeah that transition is not particularly clear... especially Waverly entering Cherry Park where you sort of have to make a no-mans land crossing of the intersection.
I think the biggest question I have here is what the section from Stewart to Joseph is going to look like through that parking garage land. Concerned its going to get no real dedicated MUT treatment or something that just dumps you into a busy parking lot and without sufficient traffic directing where Joesph crosses the tracks. These designs look good though, so hopefully that means the city was able to keep that theme through the whole way.