08-23-2016, 03:39 PM
If i can address what I think is timc's concern - the trackage through the intersection will be of two types. The straight track (LRT northbound, freight, upper in image) will be ballasted with concrete plates. The curved track (LRT southbound, lower in image) will be embedded.