08-15-2016, 01:19 PM
Hard to tell for sure from the picture, but those look like wooden ties not concrete ties. Is a different contractor doing the work on the bridge or something? I realize this is not the LRT line, but I would expect them just to use the same ties they've already ordered.
WRT first train over the bridge, how long a time frame are we looking at. My parents will be taking the train through here in about two weeks.
WRT first train over the bridge, how long a time frame are we looking at. My parents will be taking the train through here in about two weeks.