06-03-2016, 05:23 PM
I wonder how they'll handle the GEXR turnout. My guess is a line at the south side will be directly connected to the GEXR line with a switch on the east side of the underpass, before the west side approach is finished.
… lots of engineered dirt:
… lots of engineered dirt: