WIn order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 4 Vote(s) - 3.75 Average
  • 1
  • 2
  • 3
  • 4
  • 5
General Road and Highway Discussion
Reconstruction is still likely 3-5 years away, so Victoria will be long-open by then.
Reply
(08-08-2018, 09:12 PM)KevinL Wrote: Ooh, that's a tricky one. Can they get the road under the rail in enough distance from Victoria? They could try raising the rails, but the yard entrance is right there...

There's already a 10+ foot drop from the intersection to the crossing. I'd bet on the road going over, as at Margaret.
Reply
The Shell Station and Go Glass can likely handle an overpass. David's Fresh Cut Fries and the scrap yard are going to be hard pressed to have reasonable access regardless of over or under if nothing changes.

To make a grade separation work, I could see David's expropriated and an entrance built to the scrap yard in line with Breithaupt. I could also see quite a backlash happening if David's was expropriated. It has quite a neighbourhood following (and tasty fries too)
Reply
Here's one fairly intensive solution (if even plausible):

Close Lancaster for 2 years
Add a third track to the north at a lower elevation (perhaps only a few feet lower than current) going right into the yard from the west
Once the third track is active, lower the middle track to ensure safe passage of through train traffic
Once the second and third track are active, lower the southern track
Build the overpass for traffic on Lancaster at a lower elevation than would have been required

Benefits:
Grade separation
2 tracks cleared for through traffic with a third yard-specific track
Ready for HSR / GO RER / future expansion.
Reply
(08-11-2018, 07:03 PM)timio Wrote: The Shell Station and Go Glass can likely handle an overpass.  David's Fresh Cut Fries and the scrap yard are going to be hard pressed to have reasonable access regardless of over or under if nothing changes.

To make a grade separation work, I could see David's expropriated and an entrance built to the scrap yard in line with Breithaupt.  I could also see quite a backlash happening if David's was expropriated.  It has quite a neighbourhood following (and tasty fries too)

It would also be possible for the scrapyard to have an entrance onto Breithaupt at the back of their property...also possible would be Patrick St. in order to avoid heavy trucks on Brethaupt.
Reply
Ottawa South from Mill to the expressway has entered a new stage - the last month or so has been utility work on the sides, but it looks like over the weekend they tore up a number of places on the road itself, then re-patched them for this morning. What comes next, I'm not sure.
My Twitter: @KevinLMaps
Reply
The piers for the new Franklin St. Bridge over 401 are being exposed (formwork being removed). The North side is already fully exposed and they’re removing elements of the South.
For daily ion construction updates, photos and general urban rail news, follow me on twitter! @Canardiain
Reply
(08-13-2018, 06:06 PM)Canard Wrote: The piers for the new Franklin St. Bridge over 401 are being exposed (formwork being removed). The North side is already fully exposed and they’re removing elements of the South.

I wonder when they're closing the exit from 401-E to Franklyn St. N? Signage says "To be closed" but no date given. Unsure why they even have to close it at all.

Not looking forward to the closure, as I have a client in that area that I need to attend regularly. Best option would be to go through the power centre, but still not as good at the 401.
Reply
Yeah, that's "my exit" for work so I'm not looking forward to losing it, but I already have to go back home using the Townline on-ramp, so I guess it's not that much different...

Seems like they're making quick work of it.
For daily ion construction updates, photos and general urban rail news, follow me on twitter! @Canardiain
Reply
They were driving the piles for the centre supports on Friday as I drove past.

Semi-Regular commuting to the east (read: GTA) is terrible in it's soul crushing-ness, but it is fun to see the progress.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 1 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links