Ottawa Street South/Bleams Road Improvements, Fischer-Hallman Road to Knechtel Court, City of Kitchener and Township of Wilmot
Complete replacement of the deteriorated pavement structure;
• The addition of curb and gutter to provide an urban style road cross-section;
• Upsizing of the existing Zone 5, 450mm diameter watermain to a 600mm diameter watermain for a length of 3.0km;
• The addition of a new 150mm diameter local watermain to provide local services that were previously connected directly to the Zone 5, 450mm diameter trunk watermain for a length of 300m;
• Installation of a new, 250mm diameter sanitary forcemain from the proposed new Activa subdivision to the outlet at David Bergey Drive for a length of 1.2km;
• Installation of a new 3.0m multi-use trail on both sides of Ottawa Street from International Place to Trussler Road for a length of 2.2km;
• Installation of a new 1.5m wide sidewalk on both sides of Bleams Road from Trussler Road to Knechtel Court for a length of 300m;
• Installation of a new storm sewer system in various locations along the corridor and replacement of aging storm sewer system throughout the corridor as required;
• Installation of detectable warning plates to facilitate barrier-free access at all sidewalk ramp and road crossing locations;
• Improvements/enhancements to existing Grand River Transit (GRT) bus stops, as well as proposed new stops west of David Bergey Drive for a future iXpress route;
• The construction of left turn lanes for two existing/proposed residential developments between Prosperity Drive and Trussler Road. These lanes are requirements of the subdivision agreements for each and have been funded by the developers;
• Installation of a new westbound right turn lane from Ottawa Street onto Trussler Road in order to alleviate high PM peak volumes and increase the Level of Service of the intersection; and
• Installation of new street lighting west of David Bergey Drive in accordance with the Regional Illumination Policy.
Complete replacement of the deteriorated pavement structure;
• The addition of curb and gutter to provide an urban style road cross-section;
• Upsizing of the existing Zone 5, 450mm diameter watermain to a 600mm diameter watermain for a length of 3.0km;
• The addition of a new 150mm diameter local watermain to provide local services that were previously connected directly to the Zone 5, 450mm diameter trunk watermain for a length of 300m;
• Installation of a new, 250mm diameter sanitary forcemain from the proposed new Activa subdivision to the outlet at David Bergey Drive for a length of 1.2km;
• Installation of a new 3.0m multi-use trail on both sides of Ottawa Street from International Place to Trussler Road for a length of 2.2km;
• Installation of a new 1.5m wide sidewalk on both sides of Bleams Road from Trussler Road to Knechtel Court for a length of 300m;
• Installation of a new storm sewer system in various locations along the corridor and replacement of aging storm sewer system throughout the corridor as required;
• Installation of detectable warning plates to facilitate barrier-free access at all sidewalk ramp and road crossing locations;
• Improvements/enhancements to existing Grand River Transit (GRT) bus stops, as well as proposed new stops west of David Bergey Drive for a future iXpress route;
• The construction of left turn lanes for two existing/proposed residential developments between Prosperity Drive and Trussler Road. These lanes are requirements of the subdivision agreements for each and have been funded by the developers;
• Installation of a new westbound right turn lane from Ottawa Street onto Trussler Road in order to alleviate high PM peak volumes and increase the Level of Service of the intersection; and
• Installation of new street lighting west of David Bergey Drive in accordance with the Regional Illumination Policy.