04-24-2017, 02:05 PM
(04-22-2017, 01:28 PM)The85 Wrote:(04-11-2017, 08:57 AM)NotStan Wrote: How long before they announce widening from Townline Rd to Hwy 25?
(04-11-2017, 11:20 AM)Pheidippides Wrote: Is there a map with the timelines for each section from here to T-O?
There is an environmental assessment for widening from Hespeler Road to the Halton Boundary.
The Transportation Environmental Study Report (TESR) can be found below, with a map on page 19. The whole TESR document identifies the preferred alternatives for each major interchange.
http://highway401-hespeler-townline.ca/w...df#page=19
Thanks!