01-27-2017, 12:29 PM
(01-27-2017, 12:22 PM)Canard Wrote: Um. That was always the plan, no? Like, they're doing that right now. I drive through it every day!
If this is a separate thing then what the heck is the interface plan with the two additional lanes currently being constructed?
Maps. Need detailed maps!
The current contract is to widen the 401 from Highway 8 to Hespeler Road. This funding is accommodating the next (already announced) phase, from Hespeler Road to Townline Road.