12-11-2018, 04:14 PM
Hm, doing the from Wellington configuration requires creating new bridges for the rail tracks, so the ramp can pass under. If they were doing that now, I'd think they'd include the other rail bridges at the same time, and I feel like we would have seen a RFQ out for it, no?