03-13-2017, 01:08 PM
I'm also very curious about the LRT-futureproof bridge design!
I'm assuming they must have taken some of the lessons learned with the Northfield bridge and applied those to this new design, so that they don't have to do all the funky stuff (ie, ballasted track instead of embedded, extra shoring up of the sides, etc.)?