12-15-2016, 03:26 PM
Traffic on the Victoria St. bridge over the highway has been modified so that 1 lane WB and 1 lane EB are now made from the 2 WB lanes; the South side of the bridge is blocked off. I suspect this has to do more with the Bruce St. extension than it does the actual rebuilding of this bridge, so I've mentioned it in this thread.