11-17-2016, 12:01 AM
(11-16-2016, 02:41 PM)timio Wrote: I currently pass through 27 traffic lights on the fastest route to my in-laws near Fergus (14 on Victoria between Fisher Hallman and Bruce). When the highway is complete, the fastest route will drop that down to 4.
Should make the experience slightly less annoying.
Hopefully those 27 lights are timed properly so you can get there sooner and spend more time visiting
The expressway route to 401 would be less traffic lights, assuming the recent lane expansions are helping the flow? Or are you saying the current hwy 7 route is fastest.
Side note: found a link that might answer the Victoria St bridge question: http://guelph.ca/wp-content/uploads/Vict...Report.pdf (apologize if this was already posted). from Pg 67:
"Victoria Street will be closed to through traffic between
Edna Street and Bruce Street during the construction of the
Victoria Street Bridge replacement. This will require local road
detours, which will be in place for at least one year. "