05-19-2022, 10:35 PM
What I assume is a fibre expansion/replacement or something along the Victoria St. sidewalk has been a pathetic affair from the start last year. On top of the stated issues with bad signage and worksite management, they've swiss cheesed every 3rd sidewalk slab and patched with it varying fill volumes of asphalt. Impressive disregard for pedestrian infrastructure even by KW construction standards.