(08-21-2021, 01:11 PM)catarctica Wrote: Could I ask how the downtown grid is coming along? I was passing by the Market district last week and haven’t seen constructions started
Joseph St seemed to start off quickly, but still isn't done. It's been moving at a frustratingly slow pace. The center curb has been in place for ages, some of the intersections are painted, a very small portion of the lane is painted, I think most signs are in, lights were removed and re-installed at Water St (might be an unrelated project?). There is still a chunk of the bike lane and sidewalk completely missing around Water St though. I think there must be a utilities/hydro project taking place at Joseph/Water that is preventing this lane from wrapping up.
I'm not aware of any other parts of the grid that are under way aside from random streets with sharrows (which as far as I'm concerned, isn't part of the grid, because it's not infrastructure...).
I can try and grab photos soon.