10-16-2020, 01:08 PM
I don't have time to look through the construction drawings, but the renders and maps on the information sheet look like a huge step in the right direction (even if imperfect).
Does anyone know what the planned road reconstruction is on Benton from Courtland to Charles? I don't understand why it's 4 lanes, and it could potentially be a great connection to the Mike Wagner green and IHT if they put in cycling infrastructure there. Although it will probably always lack connecting infrastructure from Charles/Frederick because of the LRT.
Does anyone know what the planned road reconstruction is on Benton from Courtland to Charles? I don't understand why it's 4 lanes, and it could potentially be a great connection to the Mike Wagner green and IHT if they put in cycling infrastructure there. Although it will probably always lack connecting infrastructure from Charles/Frederick because of the LRT.