12-03-2017, 03:01 PM
The work from the Ion tracks to Erb was actually removed from the Ion project; so both should have had the same set of plans (although now that I think about it I think the extension of the separated bike lanes to the Laurel Trail came after the work was removed).
I was at least hoping they would take the opportunity to fix the clutter on the sidewalk near the pizza place:
I am still wondering why sand was used to finish the work (out of time?, too cold?).
I was at least hoping they would take the opportunity to fix the clutter on the sidewalk near the pizza place:
I am still wondering why sand was used to finish the work (out of time?, too cold?).
Everyone move to the back of the bus and we all get home faster.