04-27-2023, 10:28 AM
Looks like construction on the Margaret Avenue bike lanes has begun. The EngageWR site says stage 1 of the construction will be the stretch between Queen and Victoria, which is currently closed off between Victoria and Maynard, although I'm not sure if this is closed due to the bike lanes or the Vive Construction happening at this corner. There are also pylons set up over the bridge and down to Wellington, with a small excavator currently parked near the Breithaupt intersection. This section is marked as stage 3, but it could be that they're doing things out of order because of the existing construction at 64 Margaret.