06-09-2015, 09:25 AM
(06-09-2015, 09:11 AM)Viewfromthe42 Wrote: That is what I was wondering about. Interesting. I wonder how many spots require mounting of the rail curb for normal operation, as this setup would require.
Will it require that? There's a note saying "depressed curb along bus bay only" which is a little ambiguous, but if the rail is going to cross Willis and then pass the bus bay before turning left across King St., then I'd think the entire section would need to be flush with the roadway.