05-26-2015, 10:50 PM
(05-26-2015, 06:53 AM)Markster Wrote: Not at the same time, no.
Freight will be after-hours
While the original plan was that freight would run after-hours, a compromise was reached with the GEXR. A couple hours before the LRT shuts down for the night (eg ~11:30), the heavy rail train will travel north while the LRT vehicles are stopped clear of the Waterloo Spur. After the freight train passes to the north, the LRT will resume for the final runs of the night. With luck, the freight train will return south before the LRT starts up again in the morning. Time will tell whether the GEXR has enough time to complete its work north of Northfield before it needs to head back onto the LRT system.