04-24-2019, 10:27 PM
(04-24-2019, 09:26 PM)danbrotherston Wrote:(04-24-2019, 09:21 PM)Lens Wrote: Cadillac Fairview has installed a sidewalk parallel to the tracks connecting Wilson to the mall, along the ION station/ bus loop. Also noticed some folks walking down the tracks along the hydro corridor. That crossing needs to be built ASAP.
Along the tracks? I.e., using the trail along the tracks? Was it rebuilt then?
CF installed it in their parking lot. I think it has more to do with the proposed development stuff than anything.