Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
(03-06-2019, 11:03 PM)Bob_McBob Wrote: 3 Burn-In Tests

3.1 Upon successful completion of the Acceptance Tests, the Vehicle shall start the Burn‐In Test to be conducted by the Region and the Vehicle Supplier, with operational support from Project Co utilizing the Test Track and any other available track.

3.2 The 600 Km “Burn‐In Test" will be run on each Vehicle prior to final acceptance and shall be free of class A, B, and C failures, as generally defined below; the only permissible fault shall be of class D:
(a) Rescue towing/pushing is required ‐ Failure Mode Category A = Severe vehicle impairment
(b) Out‐of‐service to carhouse ‐ Failure Mode Category B = Vehicle impairment
© In service to end of the line ‐ Failure Mode Category C = Minor vehicle impairment
(d) In service to end of the day ‐ Failure Mode Category D = No vehicle impairment

3.3 The test shall simulate revenue service, to the extent reasonably possible, and include regular cycling of doors, PA announcements, and automatic passenger announcements, PEI operation, radio communication as well as any other feature normally encountered in revenue service. Such simulation may include manual activation of certain features. In the event that the A, B, and C fault‐free continuous 600 km is not achieved the “burn‐in” will be repeated until the requirement is met.

3.4 Upon successful completion of the Burn‐In Test, the Vehicle shall be eligible for issuance of a Vehicle Final Acceptance Certificate.
That's just for Vehicle Burn-in. The Service Simulation requirement is for the system to achieve 92% service availability each day over a 5 day period if one day is missed the period starts over.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION - Waterloo Region's Light Rail Transit - by trainspotter139 - 03-07-2019, 01:09 AM
[No subject] - by Spokes - 08-28-2014, 04:16 PM

Forum Jump:


Users browsing this thread: 93 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links