(01-28-2019, 05:31 PM)timc Wrote: Wasn't the problem that Metrolinx didn't have their system yet, and that is why we had to source other parts?
Metrolinx has lagged behind on a lot of aspects of this vehicle project beyond just the delays in equipment installation. Those delays have caused the majority of the delays in the project, while Metrolinx and the Region are still toeing the line that Bombardier is responsible for all the delays.