01-08-2019, 01:49 PM
@ert86: they are still having all sorts of problems sending trains out of Fairway. It seems about 50% of the time, they can’t properly set the route, and they ask the LRV operator to proceed to the intersection very slowly, triggering the gates and arms via the backup inductive loops placed right there. Then the LRV must wait for the arms to come down and be fully down before proceeding.