04-01-2015, 12:48 PM
Both articles characterize this as a problem due to LRT construction, but both fail to note that King St was in horrible shape and going to need to be rebuilt regardless of LRT construction. Even with the additional considerations required for LRT construction the methods they are using will likely shorten the period of inconvenience relative to a regular construction project.
Everyone move to the back of the bus and we all get home faster.