(07-04-2018, 06:13 PM)jeffster Wrote:(07-04-2018, 05:06 PM)trainspotter139 Wrote: the fix takes so long because they have to fully disassemble the vehicles to redo the welds then fully reassemble the vehicles.
Wow, eh? Just got to hope this doesn't change the timing of the start-up date, but I can't see how it won't. I think we need 12 trains for full services, with 2 spares, until we start getting another shipment of trains, which I think is still a few years away. The only option is to send in 1 train at a time, and have only 1 spare, assuming our trains are defective, which is a very good chance they are.
Why do you think there's a very good chance all our trains are defective? Weren't most of the frames built in Canada?