06-28-2018, 03:19 PM
(06-28-2018, 02:38 PM)Canard Wrote: When you ask your contractor to build you a kitchen, except you want to pick the sink... and then you don’t pick the sink, and then when you finally do, and the maker of the sink makes it from scratch to suit your countertop, and hasn’t yet issued it to them to install... who’s fault is it that the kitchen isn’t done on time?
Wait, I know this. The sink was picked first, and the rest of the kitchen was built around it. Sure, the faucet was late, and was found to be defective, but why wasn't the sink installed already?