05-31-2018, 12:41 PM
(05-31-2018, 09:34 AM)Bytor Wrote: What is the equipment that is not yet installed on the LRVs?
Great question! To further quote the report:
Quote:Prior to going into service it is also necessary to install certain specialized equipment. As part of the Project, GrandLinq is responsible for ensuring the finished vehicle integrates seamlessly with the built system. On-board equipment includes radios, antennas and on-board systems to control gates, crossings, and traffic signals. This also allows the vehicles to communicate with ION Control Centre. With this equipment, ION can run at service speeds and at consistent times throughout operations.
Aside: I'd be happy if all the phase 3 speculation (including how to pronounce wool-itch [pun, I actually pronounce the second w]) was broken out of this thread.
...K