04-23-2018, 12:22 PM
(This post was last modified: 04-23-2018, 12:25 PM by KevinT.
Edit Reason: Now with more optimism
)
Interesting tidbit posted over on Urban Toronto:
https://urbantoronto.ca/forum/threads/hi...st-1326238
The gist is that CN is taking over GEXR's freight operations between Toronto and Elmira. With CN now responsible for the end-to-end delivery of our vehicles from Bombardier, does that mean we'll be getting them faster, slower, or at about the same pace?
Edit to add: Nevermind, effective November 15, 2018. We'll have all of our vehicles by then.
https://urbantoronto.ca/forum/threads/hi...st-1326238
The gist is that CN is taking over GEXR's freight operations between Toronto and Elmira. With CN now responsible for the end-to-end delivery of our vehicles from Bombardier, does that mean we'll be getting them faster, slower, or at about the same pace?
Edit to add: Nevermind, effective November 15, 2018. We'll have all of our vehicles by then.
...K