Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Part of the reason that 6-8 months is required after the final vehicle is delivered is that the, "The vehicles also require the installation of specialized equipment that will allow them to operate at higher speeds, provide vehicle arrival time information, activate traffic signals when necessary, and better integrate with the transportation network. Installation of this equipment was also anticipated to occur in the eight months between delivery of the last vehicle and start of service. GrandLinq and Bombardier will be installing the equipment once construction of the base vehicles is complete. Testing of specialized equipment equipped trains is also required."

Which is interesting, because according to the project agreement it seems like that specialized equipment was supposed to be installed at the factory, "Project Co shall functionally test the integrated operation of all LRT Stop and wayside Train Control equipment prior to its shipment from the factory."


The burn-in test is required for the final acceptance certificate and is different from the simulated service testing; they are separate tests and are not intended to run simultaneously. One is a test of individual vehicles, the other is a test of the system.

As mentioned before the burn-in test is not as simple as accumulating 600km on the odometer. They have to be 600 problem free kilometers or else the odometer goes back to 0km and the test repeated until 600 is reached - problem free.

As much as I would like to see the Ion up and running I think starting it at anything but the intended service level would be a mistake. You want every user's first experience to be a good (and lasting one). If it isn't even as good as existing bus service that will just fuel the nay-sayers and dampen momentum toward phase 2 (and 3).

The only analogy I can think of at the moment is a Broadway show opening without the full cast with the NYT theatre critic in the audience and needing a good review and word-of-mouth recommendations to be successful enough to convince investors to fund the next big show in development.
Everyone move to the back of the bus and we all get home faster.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION - Waterloo Region's Light Rail Transit - by Pheidippides - 04-14-2018, 12:12 PM
[No subject] - by Spokes - 08-28-2014, 04:16 PM

Forum Jump:


Users browsing this thread: 102 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links