03-14-2018, 03:39 PM
(03-14-2018, 02:53 PM)JoeKW Wrote: Ethical issues aside, September is a much more realistic start date.
Late June is still possible. Bombardier would have to negotiate with CN for more local switcher time though, which they would have to do anyways once the Metrolinx and Edmonton Freedoms and TTC Flexity Outlooks start rolling off the line.