01-18-2018, 11:47 PM
Standard practice. It’s called grouting. They set the anchor bolts in the concrete, and set the pole flange over the bolts, using nuts on both sides to adjust the height and angle precisely. Once they’re happy with it they fill in the base with concrete.
Virtually every steel roller coaster is built this way.
Virtually every steel roller coaster is built this way.