11-10-2017, 02:09 PM
(This post was last modified: 11-10-2017, 02:12 PM by trainspotter139.)
(11-10-2017, 02:04 PM)nms Wrote: I assume that another pull-by test might include two LRVs traveling in parallel to make sure that there is the appropriate clearance when LRVs pass each other. Sounds silly, but better safe than sorry might be the mantra.
It's not a test that they need to run. Logic dictates that if there is enough clearance for the centre poles used for the OCS there is more than enough clearance for 2 LRVs to pass each other. If anything they might have pulled the vehicle out to test the yard track work again.