Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
(10-31-2017, 10:17 PM)trainspotter139 Wrote: That analogy falls pretty flat. You wouldn't ever have a larger group at a restaurant taste-testing the smaller group's meal. Nor would you ever have an unforeseen bug in the software that makes your meal taste good (food doesn't have software). 

The following is an non-exhaustive list of logical reasons why Bombardier could be delaying our vehicles now (this list might not even include why they are delayed):
  1. An unforeseen bug in the Operating Software discovered during testing that could: 
    1. Cause controls to be locked out resulting in the inability to apply brakes.
    2. Cause controls to be locked out resulting in the inability to apply throttle.
    3. Cause the operating software to crash resulting in the application of the emergency brakes and require a system reboot.
    4. Cause the doors to malfunction resulting in injuries to passengers.
    5. Cause the door lockout brake to engage/disengage when undesired.
  2. Metrolinx or Bombardier could have requested the use of the vehicles for multiple-unit testing (2,3,4 vehicle trains) since Metrolinx only has 2 pilots.
  3. A material deficiency in a part found during high-speed testing requiring replacement.
  4. A material deficiency in the test track resulting in a delay to track testing.


I guess we will have to agree to disagree then.

My point was that it does not matter WHY the trains are late, it matters that they ARE late.

Bombardier has had more than enough time to work out any unforeseen/unanticipated circumstances; they chose not to budget their time wisely.
Everyone move to the back of the bus and we all get home faster.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION - Waterloo Region's Light Rail Transit - by Pheidippides - 11-01-2017, 08:21 AM
[No subject] - by Spokes - 08-28-2014, 04:16 PM

Forum Jump:


Users browsing this thread: 114 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links